Pasewalk Agri-PV

Agrivoltaics

Pasewalk Agri-PV

Power and farming on the same land

In the Caselower Heide near Fahrenwalde, Vorpommern-Greifswald district, LIVOS Energies is planning an agrivoltaic system of approx. 75 MWp together with an organic farming company. Tracker rows leave wide lanes free so that the land continues to be farmed.

The system is expected to generate around 80 GWh per year and feed in at the Pasewalk substation. Solos is the technical partner and planner.

Timeline
  • Permitting planned from October 2026 to October 2027
  • Construction approx. 6 months
  • Operating life 30 years
Location
Caselower Heide near Fahrenwalde
Vorpommern-Greifswald district, Mecklenburg-Western Pomerania, Germany
Capacity (approx.)
75 MWp
Area (approx.)
79 ha
Yield p.a. (approx.)
80 GWh
Farmable up to
95 %