Part of LIVOS Gruppe
Deißlingen BESS

Battery storage

Deißlingen BESS

Grid flexibility in Baden-Württemberg

In Deißlingen in the Rottweil district, LIVOS Energies is planning a stand-alone battery storage system with 3 MW power and 6 MWh capacity, connected to the medium-voltage grid.

The storage serves several markets at once: day-ahead and intraday trading as well as balancing reserve (aFRR and mFRR).

Technology
  • HyperStrong HyperBlock III battery system with LFP cells
  • SMA inverters, meteocontrol energy management
  • Efficiency 87.3 %, availability 97 %
Timeline
  • Grid connection secured, permit applied for
  • Commissioning planned: Q3 2027
Location
Deißlingen, Rottweil district
Baden-Württemberg, Germany
Power
3 MW
Capacity
6 MWh
Duration
2 h
Commissioning
Q3 2027

Partner to industry

Your site, our asset