For an industrial site in Lower Saxony, LIVOS Energies is planning a grid-connected utility-scale storage system with 100 MW power and 200 MWh capacity, expandable to 400 MWh, connected to the 220 kV transmission grid.
Under a tolling model, LIVOS Energies finances, builds and operates the system. The site operator invests nothing and pays a fixed fee.