Part of LIVOS Gruppe
Wittstock BESS

Battery storage

Wittstock BESS

Storing green and grid power

Two battery storage systems with a combined 4.5 MW of power and 14 MWh of capacity are being built at the rooftop PV site in Wittstock/Dosse.

The green-power storage belongs to the rooftop system: it takes in solar power and releases it in the evening and at night. The grid-power storage charges from the grid and earns revenue on the power and balancing markets.

Storage
  • Green-power storage, coupled with the rooftop PV
  • Grid-power storage, grid-connected
  • Combined 4.5 MW / 14 MWh
Timeline
  • Grid connection: Q2 2027
Location
Wittstock/Dosse
Ostprignitz-Ruppin district, Brandenburg, Germany
Storage systems
2
Power
4.5 MW
Capacity
14 MWh
Grid connection
Q2 2027

Partner to industry

Your site, our asset